Local Law 97 penalty estimate
65 Hillside Avenue: $20,260/year in fees starting in 2030
Loading map
Open Street View
Loading Street View
What would the estimated penalty be in 2030, assuming nothing changes?
$20,260/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 65 Hillside Avenue will be 76 tons over the cap.
- Penalty is $268/ton over the cap, $20,260 total
Cap: 228 tons
0304 tons emitted
What is the estimated penalty for 65 Hillside Avenue right now?
$0/year
- NYC caps a building's yearly greenhouse gas emissions.
- 65 Hillside Avenue is 47 tons under the emissions cap.
- So it owes no penalty.
Cap: 379 tons
0332 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 379 to 228 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 332 to 304 tons.
- Energy use is held the same.
- Tons over go from 0 to 76 tons.
How much would the building need to cut its emissions to avoid the penalty?
25% less emissions than today
- This building must emit 25% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 65 Hillside Avenue?
23/100, grade D
- 65 Hillside Avenue scores 23 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 104 kBtu per sq ft a year.
DCBA
230100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Manhattan
- 801 Riverside Drive,$11,289 a year from 2030
- 838 Riverside Drive$1,154 a year from 2030
- 236 East 13th Street$35,094 a year from 2030
- 207-213 East 37th Street$584 a year from 2030
- 482 Fort Washington Avenue$3,447 a year from 2030