Skip to content
FeeWarden

How we estimate Local Law 97 penalties

Every number on this site comes from three public inputs and the arithmetic in the law. Nothing is modeled or guessed beyond what is listed here.

Inputs

Energy efficiency

The ENERGY STAR score and energy use per square foot come from the same Local Law 84 filing. We group scores into the city's four bands (A 85 to 100, B 70 to 84, C 55 to 69, D 0 to 54). That grouping is our reading of the published bands, and the city's official grade may differ. Buildings without a score show no efficiency section.

Arithmetic

  1. Emitted tCO2e = sum of annual energy use × emissions factor.
  2. Limit = sum of use floor area × limit per square foot.
  3. Penalty = (emitted − limit) × $268, when positive.

Emissions factors

tCO2e per unit of energy
Source2024–20292030–2034
Electricity (per kWh)0.0002890.000145
Natural gas (per kBtu)0.0000530.000053
Fuel oil #2 (per kBtu)0.0000740.000074
Fuel oil #4 (per kBtu)0.0000750.000075
District steam (per kBtu)0.0000450.000043

* Not yet verified against the city rule (1 RCNY 103-14). Estimates that rely on it are labeled as such.

Limits

The limit is floor area times the figure below, in tCO2e per square foot per year. They come from 1 RCNY 103-14, paragraphs (c)(3)(i) and (c)(3)(iii). The rule sets the 2030 to 2034 limits well below the occupancy-group figures printed in the law, and it is the rule that applies.

Limits by Energy Star property type
Property type2024–20292030–2034
Hospital (General Medical & Surgical)0.023810.007335204
Hotel0.009870.003850668
Multifamily Housing0.006750.00334664
Office0.007580.002690852

For reports covering calendar years 2024 and 2025 only, an owner could instead use the older occupancy-group limit where it was higher. Of the types above that only changes Office (0.00846 instead of 0.00758). We show the rule’s limit for the whole 2024 to 2029 period, so an Office estimate for those two years can run higher than what was owed.

Property types currently estimated

We estimate a building only when every listed use maps to an Energy Star property type with a Local Law 97 limit. Types we have not mapped are not estimated.

Adjustments you can enter

The headline estimate is before adjustments. Each building page lets you add the ones below, and the 2030 number updates. We only model rules we could check against city material.

Sources: DOB adjustments program, DOB renewable energy credits FAQ, DOB emissions guide, DOB covered-buildings matrix, Admin. Code 28-320.3.6.1.

What this does not do