Local Law 97 penalty estimate
182-12 Horace Harding Expy: $2,012/year in fees starting in 2030
What would the estimated penalty be in 2030, assuming nothing changes?
$2,012/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 182-12 Horace Harding Expy will be 8 tons over the cap.
- Penalty is $268/ton over the cap, $2,012 total
123 ton cap8 over
What is the estimated penalty for 182-12 Horace Harding Expy right now?
$0/year
- NYC caps a building's yearly greenhouse gas emissions.
- 182-12 Horace Harding Expy is 57 tons under the emissions cap.
- So it owes no penalty.
Emitted 147Allowed 204
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 204 to 123 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 147 to 131 tons.
- Energy use is held the same.
- Tons over go from 0 to 8 tons.
How much would the building need to cut its emissions to avoid the penalty?
6% less emissions than today
- This building must emit 6% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 182-12 Horace Harding Expy?
34/100, grade D
- 182-12 Horace Harding Expy scores 34 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 84 kBtu per sq ft a year.
DCBA
340100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Queens
- 25-02 Steinway Street$16,574 a year from 2030
- 25-12 Steinway Street$15,902 a year from 2030
- 2522 Steinway Street$12,043 a year from 2030
- 31-49 29th Street$14,397 a year from 2030
- 11-24 46th Ave$4,021 a year from 2030