Local Law 97 penalty estimate
99-15 67th Road may pay $17,758/year in fees starting in 2030
Loading map
Loading Street View
Why is this property expected to pay a fee beginning in 2030?
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 99-15 67th Road will be 66 tons over the cap.
- Penalty is $268/ton over the cap, $17,758 total
0Cap: 124 tons191 tons emitted
What is the estimated penalty for 99-15 67th Road right now?
$399/year
- NYC caps a building's yearly greenhouse gas emissions.
- 99-15 67th Road is 1 tons over the emissions cap.
- Penalty is $268/ton over the cap, $399 total
0Cap: 206 tons208 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 206 to 124 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 208 to 191 tons.
- Energy use is held the same.
- Tons over go from 1 to 66 tons.
How much would the building need to cut its emissions to avoid the penalty?
35% less emissions than today
- This building must emit 35% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 99-15 67th Road?
68/100, grade C
- 99-15 67th Road scores 68 out of 100 for energy efficiency.
- That is grade C on the city's scale. 50 is typical for its type.
- It uses 91 kBtu per sq ft a year.
DCBA
680100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Queens
- 37-41 79th Street$15,401 a year from 2030
- 37-42 80th Street$18,593 a year from 2030
- 13525 Hoover Ave$22,010 a year from 2030
- 37-51 79th Street$18,061 a year from 2030
- 37-52 80th Street$14,552 a year from 2030