Skip to content
FeeWarden

Sample compliance report

This is what a compliance report looks like, for a made-up 300,000 sq ft office. The peer set, trend and example bids are illustrative. The penalty and emissions figures come from the FeeWarden method.

Compliance report

Your path to
the 2030 cap

Sample office · 300,000 sq ft · Office

$331,308per year before adjustments, starting in 2030
Sample report · illustrative building and peer dataFW-SAMPLE-0001 · Oct 12, 2026
02The penalty

Where this building stands

Today, this building emits 849 tons more than it’s allowed. Beginning in 2030, the limit drops 65%, and it’s projected to emit 1236 tons more than it’s allowed.
The grid gets cleaner by 2030, so this building will also emit less by 2030.

Penalty today$227,584per year, 2024–2029
From 2030$331,308per year before adjustments
Over the cap849 to 1236tons, now and in 2030
Emissions against the cap
01,0002,0003,0004,0003,123 tons emitted2,274 tons allowed2,043 tons emitted807 tons allowed202420302034

Emissions by fuel, tons

ElectricityNatural gas01,0002,0003,0002024–292030–34

What this means

  • Natural gas is 31% of emissions today and 47% in 2030.
  • Electricity gets cleaner on its own: its share falls 50% by 2030.
  • Total emissions fall 35% by 2030, but the cap falls faster.
Sample report · illustrative building and peer data2 / 8
03Peer comparison

How you compare with similar buildings

We compared this building with 24 office buildings of 250,000 to 350,000 sq ft in the same city dataset. Each dot is one building, measured in tons per 1,000 sq ft.

Emissions per 1,000 sq ft, 2024 filings
468101214162030 cap 2.69Current cap 7.58This building: 10.41

Peer set is illustrative. A real report matches filing year and property type.

6 of 24peers under the current cap
nonepeers are under the 2030 cap today
50%of peers emit less per sq ft than this building

This building vs the peer median

Emissions per sq ftGas reliancelowesthighestmedian
Emissions are about average. Gas reliance is higher than most.
Takeaway. Peers that already comply lean on electricity. They burn about 13% of their emissions as gas, against 25% for buildings over the cap. The 2030 limit is out of reach for the whole peer group without fuel switching, so acting early puts you ahead of most of them.
Sample report · illustrative building and peer data3 / 8
04Paths to compliance

Paths to the 2030 cap

There is no single fix. Three ways to cut 1236 tons (60%) from the 2030 emissions, from all-efficiency to all-electrification. Anything in the shaded area clears the cap.

Energy cut needed against gas heating converted
0%25%50%75%100%0%10%20%30%40%Under the 2030 capStill over the capABCCut in total energy useGas heating converted

Assumes heat pumps deliver 3 units of heat per unit of electricity and the 2030 grid factor. Illustrative planning estimate, not engineering.

A

Electrify

Convert 98% of gas heating to electric heat pumps. No efficiency work.

B

Blend

Cut total energy use 15% and convert 63% of gas heating. Smaller first step.

C

Efficiency only

Cut total energy use 33.5%. Rarely achievable without fuel switching.

Where to start. Path B has the most headroom. The efficiency half pays back first, and it shrinks the electrical upgrade the heat pumps would otherwise need.
Sample report · illustrative building and peer data4 / 8
05The money

What fixing it is worth

Doing nothing costs $331,308 a year in fines, before adjustments. Any upgrade that costs less than the fines it avoids is a good deal.

Cumulative penalties if nothing changes
$0$0.5M$1.0M$1.5M$2.0M20242025202620272028202920302031203220332034$3,022,044$1,365,504

Assumes today’s energy use, the 2024 and 2030 limits, and $268 per ton. The 2035 limit is lower and is not included, so later years are understated.

Break-even budget, 5 years$1,656,540

Spend less than this on upgrades and the fines you avoid from 2030 to 2034 pay for them.

Break-even budget, 10 years$3,313,080

The same test over ten years, before any energy savings.

How to use it. If a contractor’s price for the work that closes the gap is below this number, the fines alone justify it. Above it, the case rests on fuel savings, the 2035 limit and resale value.
Sample report · illustrative building and peer data5 / 8
06Adjustments

What could lower this number

The penalty so far is before adjustments. Four things can change what you owe. Two depend on how the building is classified. Two depend on what you hold.

$331,308a year before adjustments
−$38,860a year from 1,000 MWh of credits, as an example
$292,448a year after the example credits

Check each one

Article 321 routeBuildings with over 35% of units rent-regulated, HDFC co-ops, houses of worship and buildings with a federally assisted unit follow Article 321: required measures, with no annual emissions cap.
This sample office is none of these, so the cap applies.
Income-restricted housingDOB says Mitchell-Lama buildings and buildings with income-restricted units are not subject to emissions limits until 2035.
Not the case for this sample office.
Renewable energy creditsCredits offset electricity emissions only, not gas. Only NYC-area (Zone J) clean power from the same year counts.
To do: if you hold credits, send the amount. The example above uses 1,000 MWh.
City-approved limitA few buildings have a special limit approved by the city. It replaces the standard cap.
To do: if you have one, send the approval.

Not included: carbon offsets (the city sells them at $268 a ton, the same as the fine, and they cover at most 10% of the limit), on-site solar or storage, mixed-use treatment, and filing errors.

How to use it. Confirm the route first. If Article 321 applies, the cap fine does not, and the plan changes. These are estimates, not a determination by the Department of Buildings.
Sample report · illustrative building and peer data6 / 8
07Trend and data

Trend and data check

Energy use has fallen about 1% a year. The 2030 cap needs roughly 6% a year. We also checked the filing against other city records.

Energy use per sq ft, kBtu
80100120140160201920212023202520272029At the current pace: 139Needed for the 2030 cap: 97Reported

Reported years are illustrative in this sample. Dashed lines project to 2029, the last year before the cap drops.

Data check against other city records

Floor areaYour filing says 300,000 sq ft. The city record says 311,200 sq ft.
To do: confirm which is right before May 1. A bigger area raises your limit.
Building useMatches. Both list it as B (business).
Utility billsGas bills cover 11 of 12 months.
To do: find the missing month. Incomplete bills are why most filings fail.
Fuel typesMatches. Electricity and natural gas only.
Filing historyFiled on time every year for the last 5 years.
Sample report · illustrative building and peer data7 / 8
08Quotes and next steps

Quotes and next steps

Three example bids, checked against the fines they would save.

Which bids are worth it?
BidCostCuts per yearPays for itself inVerdict
AControls and boiler tune-up$140,000210 tons2.5 yrsWorth it
BEnvelope and partial heat pumps$860,000520 tons6.2 yrsWorth it
CFull heat pump conversion$1,650,000701 tons9.0 yrsOnly over 10 years

A bid is “worth it” if it costs less than the fines it avoids: $1,656,540 over 5 years, or $3,313,080 over 10. Example figures, not real quotes.

Five tips before you start

  • Check your power supply firstHeat pumps use more electricity. Ask your utility if the building can handle it.
  • Start with a small projectA quick, visible win builds trust with residents before the big work.
  • Make a plan before you borrowA clear plan gets better loan terms, such as C-PACE (a property-tax loan).
  • Ask the city for free helpNYC Accelerator gives free advice and will check contractor bids.
  • Budget for it earlyPut the 2030 work in your five-year budget.

Your timeline

NowFix data gaps
Next 6 monthsAudit and quotes
Every May 1Annual report due
By end of 2029Work complete
2030Cap drops
Stay current. We re-run this report when new filings post, so the numbers follow the building.

This is a planning estimate from the building’s energy use and the city’s published limits. It is not a certified filing: annual reports need a licensed engineer or architect. It is not legal advice. Adjustments shown are examples, and upgrade prices need an energy audit.

Sample report · illustrative building and peer data8 / 8