Local Law 97 penalty estimate
3636 Fieldston Road
Loading map
Loading Street View
Is this property expected to be penalized in 2030 at current energy use?
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 3636 Fieldston Road will stay under the cap.
- So it may not owe a penalty.
0Cap: 586 tons533 tons emitted
What is the estimated penalty for 3636 Fieldston Road right now?
$0/year
- NYC caps a building's yearly greenhouse gas emissions.
- 3636 Fieldston Road is 372 tons under the emissions cap.
- So it may not owe a penalty.
0Cap: 971 tons600 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 971 to 586 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 600 to 533 tons.
- Energy use is held the same.
- Tons over go from 0 to 0 tons.
How much would the building need to cut its emissions to avoid the penalty?
- No cut is needed.
- At its current energy use it stays under the 2030 cap.
How energy efficient is 3636 Fieldston Road?
61/100, grade C
- 3636 Fieldston Road scores 61 out of 100 for energy efficiency.
- That is grade C on the city's scale. 50 is typical for its type.
- It uses 72 kBtu per sq ft a year.
DCBA
610100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Similar buildings in the Bronx
- 1038-52 Anderson Avenue$41,614 a year from 2030
- 2100 Wallace Avenue$23,146 a year from 2030
- 1410 Hicks Street$14,299 a year from 2030
- 940 Grand Concourse$36,659 a year from 2030
- 3135 Johnson Avenue$17,707 a year from 2030