Local Law 97 penalty estimate
117 West 58th st: $21,752/year in fees starting in 2030
What would the estimated penalty be in 2030, assuming nothing changes?
$21,752/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 117 West 58th st will be 81 tons over the cap.
- Penalty is $268/ton over the cap, $21,752 total
Cap: 269 tons
0350 tons emitted
What is the estimated penalty for 117 West 58th st right now?
$0/year
- NYC caps a building's yearly greenhouse gas emissions.
- 117 West 58th st is 27 tons under the emissions cap.
- So it owes no penalty.
Cap: 447 tons
0420 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 447 to 269 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 420 to 350 tons.
- Energy use is held the same.
- Tons over go from 0 to 81 tons.
How much would the building need to cut its emissions to avoid the penalty?
24% less emissions than today
- This building must emit 24% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 117 West 58th st?
30/100, grade D
- 117 West 58th st scores 30 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 105 kBtu per sq ft a year.
DCBA
300100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Manhattan
- 610 West 141 Street$3,074 a year from 2030
- 2441 A C Powell Boulevard$15,184 a year from 2030
- 98 Morningside Avenue$1,416 a year from 2030
- 584 West End Avenue$19,589 a year from 2030
- 3340 Broadway$61,405 a year from 2030