Local Law 97 penalty estimate
143-25 84 DR;142-35 84th Drive;8455 Daniel St: $180,879/year in fees starting in 2030
Loading map
What would the estimated penalty be in 2030, assuming nothing changes?
$180,879/year
- Beginning in 2030, the city drops the emissions cap by 40%.
- At the same energy use, 143-25 84 DR;142-35 84th Drive;8455 Daniel St will be 675 tons over the cap.
- Penalty is $268/ton over the cap, $180,879 total
Cap: 720 tons
01,395 tons emitted
What is the estimated penalty for 143-25 84 DR;142-35 84th Drive;8455 Daniel St right now?
$75,656/year
- NYC caps a building's yearly greenhouse gas emissions.
- 143-25 84 DR;142-35 84th Drive;8455 Daniel St is 282 tons over the emissions cap.
- Penalty is $268/ton over the cap, $75,656 total
Cap: 1,195 tons
01,477 tons emitted
Why does the penalty change in 2030?
- The emissions cap will be lowered by 40% in 2030, from 1,195 to 720 tons.
- NYC's grid will become cleaner by 2030, reducing this building's projected emissions from 1,477 to 1,395 tons.
- Energy use is held the same.
- Tons over go from 282 to 675 tons.
How much would the building need to cut its emissions to avoid the penalty?
49% less emissions than today
- This building must emit 49% less to avoid penalties.
- Owners can utilize energy efficiency upgrades or switch from gas or oil to electric.
How energy efficient is 143-25 84 DR;142-35 84th Drive;8455 Daniel St?
7/100, grade D
- 143-25 84 DR;142-35 84th Drive;8455 Daniel St scores 7 out of 100 for energy efficiency.
- That is grade D on the city's scale. 50 is typical for its type.
- It uses 151 kBtu per sq ft a year.
DCBA
70100
How reliable is this estimate?
- This is a planning estimate, not the city's official number.
- Owners report their own energy use, and reports can have mistakes.
- The city makes the final call.
- ✓Energy use comes from the building's own 2024 report to the city
- ✓Emissions rates for 2024 to 2029 match the law
- ✓Emissions rates for 2030 on match the city rule
- ✓The property type is matched to the city's category
- ○The compliance route the city assigns is not confirmed
Own or manage this building?
Get up to 3 quotes from vetted energy contractors.
Get quotes to cut this penalty
Similar buildings in Queens
- 134-30 Franklin Avenue$5,187 a year from 2030
- 84-01 Main Street$38,224 a year from 2030
- 84-10 / 84-20 153rd Avenue$6,059 a year from 2030
- 67-85 224 STREET$50,340 a year from 2030
- 139-19/25 31 Road$29,919 a year from 2030