Skip to content
FeeWarden

Local Law 97 Penalties by Building Type: Multifamily, Hospital and Office

Short answer: Local Law 97 charges every building $268 per ton over its limit, but the limit per square foot depends on use. The 2030 limits are about 50% to 79% lower than the 2024 to 2029 limits, and the penalty depends on how far a building's energy use is above its limit.

Figures for 2030 and later are projections at today's energy use, not a bill or a forecast of what the city will charge.

General information from public sources, not legal, engineering or compliance advice. Figures are projected estimates, not city bills or determinations.

Limits per square foot for each building type

The limit is the building's floor area times the figure below. These are tCO2e per square foot per year.

Limits by Energy Star property type
Building type2024–20292030–2034Drop
Multifamily Housing0.006750.0033550%
Office0.007580.0026965%
Hospital (General Medical & Surgical)0.023810.0073469%

The 2030 cut ranges from 50% to 69% across these three types. These are the limits in the city's rule (1 RCNY 103-14). See the full guide.

What that means in real energy use

Dividing a limit by an emissions factor gives the most energy a square foot can use before reaching it, if that were the building's only source. It is a way to compare, not a target, since real buildings mix fuels.

Energy a square foot can use before reaching the limit, one source at a time
Building typeGas kBtu, 2024–2029Gas kBtu, 2030–2034kWh, 2024–2029kWh, 2030–2034
Multifamily Housing127.163.023.423.1
Office142.750.726.218.6
Hospital (General Medical & Surgical)448.3138.182.450.6

Read the first row as: an apartment building using only gas hits its 2024 limit at about 127 kBtu per square foot a year, and its 2030 limit at about 63. The electricity columns rise in 2030 because the electricity factor falls.

How many buildings of each type would owe

From the buildings we have estimated:

Estimated buildings on this site, by property type
Property typeBuildingsOwing from 2030Middle penalty a year
Multifamily Housing4,67755%$16,000
Office81545%$18,000
Hotel50755%$26,000
Hospital (General Medical & Surgical)5072%$424,000
Mixed Use Property250%$64,000

Notes for each type

  • Multifamily. Mostly a heating and hot water story. Gas and oil boilers drive emissions. Many rent-regulated buildings use the required-measures pathway instead.
  • Office. Electricity often dominates, so the falling 2030 electricity factor helps. Mixed-use buildings add limits for each use.
  • Hospital. Round-the-clock operation and process loads mean high energy use, and high limits. Steam and gas are common.

For the formula, read how the penalty is calculated.

Frequently asked questions

Which building type has the strictest Local Law 97 limit?

Among multifamily, office and hospital buildings, hospitals have the highest limit per square foot, because they use more energy. Higher limits are not always easier to meet, since these buildings also use the most energy.

Do apartment buildings pay the same penalty as offices?

The rate is the same, $268 per ton over the limit. The limit per square foot and the typical energy use are different, so the totals differ.

Are rent-regulated apartment buildings covered?

It depends on the share of rent-regulated units. Over 35% can follow Article 321, a set of required measures instead of the emissions cap. From 1% to 35% must meet the cap, starting with 2026 emissions (first report due May 1, 2027). DOB's Covered Buildings List says which applies.

Why does this site estimate only some building types?

We estimate a building only when its listed uses map cleanly to an Energy Star property type with a limit. The method page lists the types covered today.

Sources

More Local Law 97 guides

Want this checked for your building?

Get free help to cut the penalty, a written compliance report, or a review across your portfolio.

Get free help planning upgrades

Tell us how to reach you. Within a business day we reply and connect you with free city help (NYC Accelerator, the city's free Local Law 97 program) and energy contractors who can quote the work. We only pass your details to a contractor after you say yes by email.

Order Compliance ReportSample →

A written report for this building: emissions by fuel, the gap to each cap, and the cheapest path to close it. Tell us where to send it and we will confirm scope and price by email.

Order Portfolio ReviewSample →

One review across all your buildings: penalty exposure by property and the order to fix them in. Tell us how to reach you and we will send a quote.